Campus explorer

Over 30 hectares. Every system.

Pick a layer to follow the energy, carbon and water around the site, or tap a point to see what it does. Switch to Expert for the engineering detail.

ExpertOn the plan. Turn on dimensions, equipment ratings, a 100 m grid and the fire main. Pick any point for its design values and sources.

Data centre building

Heat leaves the halls, the CO₂ cooling system moves it, the roof lets it go.

Each building stacks five 5 MW data halls over three floors. Air handlers beside each hall pass the heat to the CO₂ cooling plant on the ground floor, which releases it from coolers on the roof.

≈99.8 m long; levels 0 / 4.8 / 9.6 m, roof 14.4 m. Halls of ≈1,350 m² flanked by CRAH rooms (≈313 m²), CO₂ cooling plant (≈2,160 m²) and loading bay at ground level, gas coolers on the roof. Secondary interface open for air, direct-liquid or AI-density cooling.

Around the site

Walk the campus.

ExpertReading the renders. Each caption says what is fixed and what is not.